Granbury, Texas

Granbury South WWTP: BNR + MBR Rehabilitation on a Site That Couldn’t Expand

City of Granbury • Completed 2023
  • MBR
  • BNR
  • Type I Reuse
  • Non-Expansion Site
  • SRF-Funded
Type I
Reuse-Grade Effluent
No Expansion
Capacity Gained Within Footprint
$34.95M
TWDB SRF — Phase 1 Program
Granbury, TX South WWTP-Phase 1
2.0 MGD
Design Capacity
BNR + MBR + UV
Treatment Process
2023
Online

The Challenge

In 2016 the South WWTP triggered TCEQ's 75%-capacity rule, and the City was reporting sanitary sewer overflows with Lake Granbury at risk. But a Harbor Lakes HOA non-expansion agreement legally caps the site — a conventional capacity expansion was not an option.

The Solution

The City's ~$35M Phase 1 program rehabilitated the existing 2.0 MGD South plant in place — converting conventional activated sludge to biological nutrient removal with a membrane bioreactor and UV — and built a separate East satellite plant for the growth the South site couldn't hold.

The Result

The rehabilitated plant came online in 2023, producing TCEQ Type I reuse-grade effluent within the original footprint — securing the golf-course reuse program and protecting Lake Granbury. The Phase 1 program was funded by a $34.95M TWDB Clean Water SRF loan.

The Challenge

A Deadline, Not a Choice

The City of Granbury’s South WWTP — last expanded in 2000 — hit a hard regulatory marker in 2016: three consecutive months operating above 75% of permitted capacity, which triggers TCEQ’s requirement to begin planning and engineering for additional capacity. The City was also reporting sanitary sewer overflows to TCEQ, and the plant discharges to Lake Granbury itself — a recreational reservoir where effluent quality is not negotiable.

The Site Was Capped — Legally

The obvious move — expand the South plant — was off the table. The South site sits next to the Harbor Lakes community, and the City holds a non-expansion agreement with the Harbor Lakes HOA that legally limits the site. That constraint is the defining feature of this project: it forced the City away from a conventional “pour more concrete” expansion and toward a two-part answer — and it is a constraint other Texas lake- and reservoir-front communities will recognize.

Why this matters for Texas plants. A growing utility that can’t expand its existing plant site — because of an HOA agreement, a floodplain, a property line, or an inter-local boundary — still has a path: rehabilitate the existing plant in place to a higher-performing process within the same footprint, and add satellite capacity elsewhere. Granbury ran both plays at once under one SRF-funded program.

The Solution

One Program, Two Plants

The City’s Phase 1 Wastewater Improvements Program — roughly $35 million total — bundled the rehabilitation of the existing 2.0 MGD South WWTP (this project), a new 1.0 MGD East satellite WWTP, and collection-system improvements. The entire program was financed by a Texas Water Development Board Clean Water State Revolving Fund loan of $34,950,000.

From Conventional Activated Sludge to BNR + MBR

The South rehabilitation converted an existing conventional activated-sludge plant to a biological nutrient removal (BNR) process with a membrane bioreactor (MBR) and UV disinfection, producing TCEQ Type I effluent — the state’s highest-quality reuse grade. The membrane bioreactor matters here for a specific reason: it delivers reuse-grade effluent within the existing footprint, which is exactly what a capped site requires.

Equipment — Headworks Through Disinfection

Vision Equipment supplied the South plant’s equipment train across the full process:

Process step Equipment Manufacturer
Coarse screening Headworks screens Duperon
Fine screening Mechanical fine screens Cleantek
Grit removal Tray degritting Envirodyne Systems Inc.
Aeration Retrievable strip diffusers Jaeger Aeration
Biological treatment flexMBR membrane bioreactor H2O Innovation
Disinfection UV NeoTec

The flexMBR “Open-Source” Membrane Platform

H2O Innovation’s flexMBR is what the company calls a universal, open-source membrane system: it runs membrane modules from different suppliers, and lets an owner swap membranes over the life of the plant without redesigning the plant around a single proprietary module. That is the mechanism behind H2O’s “Flex” lifecycle-cost approach — the owner keeps the ability to compete membrane suppliers for decades, instead of being locked to whatever was installed on day one.

The Results

Online 2023, Within the Footprint

The rehabilitated South WWTP came online in 2023, delivering BNR + MBR + UV treatment and TCEQ Type I reuse-grade effluent within the original capped site. The City met its TCEQ 75%-rule obligation without acquiring land or breaking the Harbor Lakes non-expansion agreement.

A Reuse Outcome That Was Already Working

Type I effluent from the Granbury system has irrigated the Harbor Lakes Golf Course since 2011 — roughly 1 MGD of reclaimed water — with the remainder returning to Lake Granbury. The rehabilitation did not invent the reuse program; it secured it, locking in the effluent quality that makes the golf-course reuse and the lake discharge defensible for the next plant generation.

Implications for Texas Plants

Three replicable takeaways:

  1. A capped site is not a dead end. When an HOA agreement, floodplain, or boundary blocks expansion, an in-place process upgrade — conventional activated sludge to BNR + MBR — can raise performance and secure reuse-grade effluent without enlarging the footprint.
  2. Pair an in-place upgrade with a satellite plant. Granbury funded both the South rehabilitation and a new East satellite plant under one SRF program — capturing shared engineering, permitting, and financing instead of running two disconnected capital events.
  3. The TCEQ 75% rule is a planning trigger, not a surprise. Granbury’s clock started in 2016; the program was financed and underway years before a hard violation. Utilities approaching 75% of permitted capacity should treat it as the start of a fundable program.

Frequently Asked Questions

Can a wastewater plant be upgraded without expanding the site?

Yes. The City of Granbury’s South WWTP sits next to the Harbor Lakes community under a non-expansion agreement that legally caps the site. Rather than expand, the City rehabilitated the existing 2.0 MGD plant in place — converting a conventional activated-sludge process to biological nutrient removal with a membrane bioreactor and UV disinfection — which raised treatment performance and produced TCEQ Type I reuse-grade effluent without enlarging the footprint. Growth the South site couldn’t absorb was routed to a separate new East satellite plant in the same program.

What is TCEQ's 75% capacity rule?

Under Texas Commission on Environmental Quality rules, when a wastewater treatment plant operates at or above 75% of its permitted capacity for three consecutive months, the permit holder must begin planning and engineering for additional capacity. The City of Granbury’s South WWTP triggered this rule in 2016, which started the planning that became the City’s Phase 1 Wastewater Improvements Program.

What is TCEQ Type I reuse-grade effluent?

Type I is the highest-quality reclaimed water classification under Texas reuse rules — clean enough for uses with a high likelihood of human contact, such as landscape irrigation of parks and golf courses. The rehabilitated Granbury South WWTP produces Type I effluent, which has irrigated the Harbor Lakes Golf Course since 2011, with the remainder returning to Lake Granbury.

What is an MBR, and why use one here?

A membrane bioreactor (MBR) combines biological treatment with membrane filtration, producing very high-quality effluent in a compact footprint. At Granbury South, that compactness is the point: the MBR delivers reuse-grade effluent within the existing capped site. The plant uses H2O Innovation’s flexMBR, an open-source membrane platform that lets the owner run — and later swap — membrane modules from different suppliers without redesigning the plant.

Does Vision Equipment supply equipment for Texas MBR projects?

Yes. Vision Equipment supplied the Granbury South WWTP’s equipment train from headworks through disinfection, and has supplied H2O Innovation MBR systems on multiple Texas projects. For project-specific MBR sizing or evaluated-bid support, contact a Vision Equipment representative.

Facing a capacity deadline on a site you can't expand?

Vision Equipment's applications engineers can help you evaluate MBR retrofits and BNR upgrades that work within a constrained footprint.

Request a Consultation